: +86 13588765786         : info@jinmengcomposite.com
You are here: Home / News / Cases / Install Water Valve Box In Front Jinmeng Office Building

Install Water Valve Box In Front Jinmeng Office Building

Author: Site Editor     Publish Time: 2022-08-23      Origin: Site

facebook sharing button
twitter sharing button
linkedin sharing button
pinterest sharing button
kakao sharing button
sharethis sharing button

An 34.2 Meter Height is Constructed in Sakura Industrial Campus which named as Jinmeng Office Building, our contractors install infrastructure of water pipings, sewer piping, and control units.  This content shows how they install water valve box

Since it is rebuilt in the original factory area, the driver of the hydraulic road breaker is breaking pavement on the roadside area.

The excavator driver remove the road waste such as concrete cracks, rocks, and dug a trench for the piping system, The trench is for sewer pipings which near irrigation sprinkler tubings

Build Sewage Pipings

Install Water Tubings beside the Sewage Piping

Placing the Water Valve Box for the greenbelt irrigation system

Remove the construction waste of concrete blocks, and stones, flatten the ground, cover the valve box surface with a plastic film, and remove it when finishing the concrete works on the surface


CONTACT US

: +86 13588765786
: info@jinmengcomposite.com
: #2 Jinsha Rd, Yuqian Town, Lin’an District, Hangzhou City. Zhejiang Province, China
Copyright © 2019 Hangzhou Jinmeng Road Establishment Co., Ltd.